1 Lubang Pelubangan Pada Besi | Lubang | 2.539 | ||
1 m Panjang Rak, Frame Taman Vertikal Media Rak Pot Tanpa Tiang dan Tanaman | m | 536.241 | ||
1 m Pemagaran Pagar Besi Taman Kota (Lahan Matang) | m | 2.920.048 | ||
1 m Pemasangan Saluran U-Ditch tipe 400x300x1200, Mutu K350 + Galian + Pasir Urug tebal 5 cm + Memindahkan Tanah Bekas Galian | m | 441.419 | ||
1 M Pembongkaran Bingkai Beton | m | 48.884 | ||
1 M2 Pasang Kayu Papan | M2 | 154.461 | ||
1 M2 Pasang Plastik Cor | M2 | 10.800 | ||
1 M2 Pekerjaan Area Refleksi | M2 | 1.137.025 | ||
1 m2 PEKERJAAN JEMBATAN TAMAN | M2 | 1.635.698 | ||
1 M2 Pekerjaan Pasangan Rubber Floor (Fitness) | M2 | 765.385 | ||
1 m2 Pekerjaan Pedestrian Bahan Andesit (Belum Termasuk Bahan) | M2 | 232.197 | ||
1 m2 Pekerjaan Pembuatan Lantai CPG (Belum Termasuk Bahan) | M2 | 763.592 | ||
1 m2 PEKERJAAN PENDOPO TAMAN DENGAN ATAP ASPAL | M2 | 1.907.813 | ||
1 m2 Pekerjaan Seating Wall (Belum Termasuk Bahan) | M2 | 375.130 | ||
1 M2 Pembangunan Pergola Lorong | M2 | 3.495.092 | ||
1 m2 Pembangunan Taman Tipe A (0-1000 m2) | M2 | 354.777 | ||
1 m2 Pembangunan Taman Tipe B (1000-5000 m2) | M2 | 258.129 | ||
1 m2 Pembuatan Sarana PenyiramanType Impact (Luas > 1 Ha) | M2 | 22.878 | ||
1 M2 Penataan Jalur Hijau (Type 1) | M2 | 156.252 | ||
1 M2 Penataan Jalur Hijau (Type 3) | M2 | 186.334 | ||
1 M2 Perkerasan Florhardener | M2 | 613.845 | ||
1 M2 Upah Penanaman Groundcover (Untuk Tanaman Groundcover 25 Polybag/M2 Tanpa Bahan) | M2 | 35.324 | ||
1 M3 Pekerjaan Galian Tanah Lumpur Sedalam 1 Meter | M3 | 130.610 | ||
1 M3 Pekerjaan Pemindahan Tanah Mekanis Dengan Alat Berat (Cut And Fill) | M3 | 47.590 | ||
1 M3 Pekerjaan Pengangkutan Material/ Hasil Galian Sejauh 200 M | M3 | 105.274 | ||
1 m3 Pembuatan dan Pemasangan Sumur Resapan Tipe Modular Tank Bahan Poly-Propylane Kapasitas 0.125 m3 di Bawah Lapisan Conblok beserta Bak Kontrol | M3 | 3.467.776 | ||
1 Unit Gapura Ornamen TPU Finishing Granito dan Andesit Bakar + Instalasi Lampu dengan Pintu Gerbang Besi Hollow Persegi | unit | 126.703.646 | ||
1 unit Kolom Pagar Besi Taman Kota | unit | 1.530.427 | ||
1 Unit Pekerjaan Pemasangan PHB (Panel bagi) | unit | 4.921.047 | ||
1 Unit Pekerjaan Pembangunan Lampu Taman Tiang Antik Cab.2 (t = 5m) | unit | 12.518.971 | ||
1 Unit Pekerjaan Pembuatan Papan Blok TPU | unit | 7.409.712 | ||
1 unit Pekerjaan Pilar Pagar Taman Kota | unit | 2.935.934 | ||
1 Unit Pilar Beton Pagar Taman Kota | unit | 4.304.261 | ||
Air Mancur (Kolam Warna Susun 3) | unit | 8.250.000 | ||
Bangku Taman Batu Andesit | unit | 2.073.500 | ||
Batu Acak Purwakarta | M2 | 92.034 | ||
Batu Hias | Karung | 131.450 | Kerikil Warna,Putih,Hitam | |
Bingkai Beton Lurus | m | 163.396 | Uk. 18/ 22X25-60, K400, | |
Children Play Ground | unit | 42.900.000 | Cpg Tipe 3 Uk. 3 X 3 M | |
Geotextile Woven | M2 | 17.217 | ||
Kansteen Jepit | Rupiah | 22.000 | ||
Kolom Standart Pagar Panel | lembar | 155.628 | K. Std Uk. 170X170X2400 Mm | |
Outdoor Fitness 4 Swivel Wheel | unit | 7.700.000 | ||
Outdoor Fitness Air Walker | unit | 8.200.000 | ||
Outdoor Fitness Bench For Two | unit | 10.400.000 | Lokal | |
Outdoor Fitness Chest Press Two Seats | unit | 17.000.000 | ||
Outdoor Fitness Double Children Press Board | unit | 6.000.000 | Lokal | |
Outdoor Fitness Double Children Swings | unit | 11.500.000 | Lokal | |
Outdoor Fitness Double Massage For Waist | unit | 8.200.000 | Lokal | |
Outdoor Fitness Elliptical Machine | unit | 8.800.000 | Lokal | |
Outdoor Fitness Handstand Shelf | unit | 10.400.000 | Lokal | |
Outdoor Fitness Hanging Swivel | unit | 8.200.000 | ||
Outdoor Fitness Horse Rider Machine | unit | 5.500.000 | Lokal | |
Outdoor Fitness Lat Pull Down Two Seats | unit | 17.000.000 | Lokal | |
Pagar Panel | Batang | 85.743 | Panel 50X400X2400 Mm | |
Panel Pagar Precast Mutu K225 | Buah | 120.175 | 5X40X240 Cm | |
Panjatan Lingkaran | unit | 9.075.000 | ||
Set Mainan Anak | set | 263.890 | ||
Stiker Kaca Glass Film | set | 69.300 | ||
Tiang Pagar Pracetak Mutu K225 | Buah | 384.037 |
Anda Butuh Harga satuan versi Excel lengkap? Hubungi Konsultan NGO TOPAN AD diemail ke : victorjulu@gmail.com
Kamis, 14 April 2016
Konstruksi Taman
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar